[1] Issa, U.H., 2013. Implementation of lean construction techniques for minimizing the risks effect on project construction time. Alexandria Engineering Journal, 52(4), pp.697-704.
https://doi.org/10.1016/j.aej.2013.07.003.
[2] Owolabi James, D., Amusan Lekan, M., Oloke, C.O., Olusanya, O., Tunji-Olayeni, P. and Owolabi Dele, P., 2014. Causes and effect of delay on project construction delivery time. International journal of education and research, 2(4), pp.197-208.
[3] Adeyemi, A. Y., & Masalila, K. (2016). Delay factors and time-cost performance of
construction projects in Gaborone City Council, Botswana.
Journal for the Advancement
of Performance Information & Value,
8(1).
https://doi.org/10.37265/japiv.v8i1.46.
[4] Doloi, H., Sawhney, A., Iyer, K.C. and Rentala, S., 2012. Analysing factors affecting delays in Indian construction projects.
International journal of project management,
30(4), pp.479-489.
https://doi.org/10.1016/j.ijproman.2011.10.004.
[5] Viles, E., Rudeli, N.C. and Santilli, A., 2020. Causes of delay in construction projects: a quantitative analysis.
Engineering, Construction and Architectural Management,
27(4), pp.917-935.
https://doi.org/10.1108/ECAM-01-2019-0024.
[8] Mbala, M., Aigbavboa, C. and Aliu, J., 2019. Causes of delay in various construction projects: A literature review. In Advances in Human Factors, Sustainable Urban Planning and Infrastructure: Proceedings of the AHFE 2018 International Conference on Human Factors, Sustainable Urban Planning and Infrastructure, July 21-25, 2018, Loews Sapphire Falls Resort at Universal Studios, Orlando, Florida, USA 9 (pp. 489-495). Springer International Publishing. https://doi.org/10.1007/978-3-319-94199-8_47.
[9] Al‐Kharashi, A. and Skitmore, M., 2009. Causes of delays in Saudi Arabian public sector construction projects.
Construction Management and Economics,
27(1), pp.3-23.
https://doi.org/10.1080/01446190802541457.
[10] Mohammed, S.R. and Jasim, A.J., 2017. Study and analysis of the delay problems in Iraqi construction projects. International Journal of Science and Research (IJSR), 6(5), pp.2331-2336. DOI: 10.21275/ART20173791.
[11] Kim, B.G., Shakir, Z.N. and Nasrulloeva, R.A., 2020, March. Risk factors affecting the implementation of construction projects in Iraq. In IOP Conference Series: Materials Science and Engineering (Vol. 786, No. 1, p. 012015). IOP Publishing. DOI: 10.1088/1757-899X/786/1/012015.
[13] Al Musawi, L. and Naimi, S., 2023. The management of construction projects in Iraq and the most important reasons for the delay. Acta Logistica, 10(1), pp.61-70. https://doi.org/10.22306/al.v10i1.351.
[14] Rajab, H.A.M. and Breesam, H.K., 2024, August. Causes of troubled and delayed construction projects in Iraq: University buildings as a case study. In
AIP Conference Proceedings (Vol. 3105, No. 1). AIP Publishing.
https://doi.org/10.1063/5.0213439.
[15] Bekr, G.A., 2015. Causes of Delay in Public Construction Projects in Iraq. Jordan Journal of Civil Engineering, 9(2).
[16] Alklkali, A.M., 2024. Analyzing Delay Factors in Iraqi Construction Projects: An ANP Approach with Najaf Governorate as a Case Study.
Engineering, Technology & Applied Science Research,
14(6), pp.17844-17847.
https://doi.org/10.48084/etasr.8536.
[17] Mahdi, A.M. and Erzaij, K.R., 2024, May. Construction project trouble factors influencing project success in Iraq. In
AIP Conference Proceedings (Vol. 3091, No. 1). AIP Publishing.
https://doi.org/10.1063/5.0205030.
[18] Al Kulabi, A.K. and Atiea, H.M.J., 2022. Time overruns in the construction projects in Iraq: Case study on investigating and analyzing the root causes.
Open Engineering,
12(1), pp.702-715.
https://doi.org/10.1515/eng-2022-0351.
[19] Zamim, S.K., 2021. Identification of crucial performance measurement factors affecting construction projects in Iraq during the implementation phase.
Cogent engineering,
8(1), p.1882098.
https://doi.org/10.1080/23311916.2021.1882098
[20] Haseeb, M., Bibi, A. and Rabbani, W., 2011. Problems of projects and effects of delays in the construction industry of Pakistan. Australian journal of business and management research, 1(5), pp.41-50.
[21] Al-Saffar, M., Darwish, A.S.K. and Farrell, P., 2023. High risk and impact factors on construction management process− case study of COVID-19 of a hospital in Iraq.
Renewable Energy and Environmental Sustainability,
8, p.4.
https://doi.org/10.1051/rees/2023004.
[22] Kulabi, A.K.A. and Lebban, M.F.A., 2023, July. Identifying and analyzing failure factors of public construction projects: a case study. In
AIP Conference Proceedings (Vol. 2775, No. 1). AIP Publishing.
https://doi.org/10.1063/5.0140817.